How it works in practice — three use cases.
Using the same example data that also appears in the control center and in the other demos — synthetic, for illustration, not real customer data. Every step points to the place in the control center where you can verify it yourself. Each case shows an example from the power grid — and below it, how the same pattern looks in gas, water, wastewater, district heating and rail.
Before the Audit
An external auditor announces their visit for next week. Until now that meant: search through folders, ask colleagues, hope nothing is missing.
- The team opens the control center, view "Risk Status" — and sees at a glance where something is still missing: Compliance declaration missing — Substation South, blocking Gate G4 · Approval.
- Open items are closed before the appointment instead of only surfacing at the audit — the same logic as in the "Deadlines" view.
- On the day of the audit, the auditor scans the QR code on the asset nameplate and lands directly on the stored record — instead of first searching the archive or three different folder structures.
- Every status statement can be traced back to its record — that speeds up audit preparation. Important: supporting audit-readiness is different from guaranteeing an audit outcome, more on this in the FAQ "How does LAD support audits?".
The same pattern in other sectors:
Visible in the control center via the sector switch.
Network Expansion Project Through Handover
Before the next status report, project management wants to know where delay actually threatens — not only once it has already occurred.
- A new asset is created — for example cable route A9: 2 records open, currently in Gate G3 · Construction.
- As construction progresses it moves toward Gate G4 · Approval — as with Substation South, where a missing compliance declaration is blocking the gate.
- Before the handover appointment, the "By Gate" view in the control center shows which assets at Gate G4 · Approval still have open records — steer course instead of improvising on handover day.
- Once everything is complete, the asset reaches Gate G5 · Handover and finally Gate G6 · Acceptance — as with the overhead line, where all records are already complete and Gate G6 · Acceptance has been reached.
The same pattern in other sectors:
Compressor Station East: pressure test overdue, blocking Gate G3 · Construction.
In the control center →Control & Signalling Systems East: signalling acceptance test outstanding, blocking Gate G4 · Approval.
In the control center →Visible in the control center via the sector switch.
Staff Turnover on the Team
An experienced person who has known an asset for years retires or changes jobs.
- Without a control center: the knowledge leaves with them — standards and exceptions often existed only in that person's head.
- With a control center: rules, chains of evidence and roles sit explicitly in the system, not tied to a person.
- The successor sees in the "By Team" view immediately what's open for their own team — for example the 4 open items at Network Expansion project management or the 2 at Asset Management.
- A staff change changes nothing about the chain of evidence — it stays traceable in the system, not tied to a person.
The same pattern in other sectors:
Wastewater Treatment Plant Central: inspection report overdue, blocking Gate G4 · Approval.
In the control center →Both sit in the system — not only in the head of the person who knows the asset. Visible in the control center via the sector switch.
How it works on your own network.
30 minutes, no system access: using your use case we check whether a pilot area can be clearly scoped — no slide deck.
- Send a requestBriefly, your topic and your sector.
- 30-minute conversationOn your use case, no system access.
- A clear answerWhether a pilot area can be clearly scoped.
All three scenarios use the same synthetic example data that also appears in the control center and in the document room demo — not real customer data. How it looks with your own assets and your own network is something we work out without obligation in a discovery call.
