Linea AureaDocumenta
Domains & Roles

One logic — many networks, many roles.

The control center is broken down by sector and shows every role the view that fits. And it sits above your existing systems.

One control center · many sectors

The same Control Center logic — every type of infrastructure with its own depth.

The control center is broken down by sector — each with its own document type catalog, down to the individual areas of network operations. How far the templates are built for each sector is shown openly in the status.

Twelve sectors in the catalog

Counted document types per sector, as of Nov 14, 2026. Five sectors are established, seven in development — same structure, same core. See product status →

Electricity · 5,2105,210Electricity41.0 % of the catalogRail · 1,5131,513Rail11.9 % of the catalogAirports · 941941Airports7.4 % of the catalogRoads and tunnels · 820820RoadsWater and wastewater · 749749WaterGas · 737737GasDistrict heating · 632632District heatingNuclear power · 595595Nuclear powerHydrogen · 467467HydrogenData centers · 401401Data centersFood production · 328Telecommunications · 326Σ = 12,719 · a(i) = n(i) / Σestablishedin development
  1. Electricityincluding ground-mounted solar and onshore wind5,210 document typescatalog + templates
  2. Rail1,513 document typescatalog + templates
  3. Water and wastewater749 document typescatalog · templates per project
  4. Gas737 document typescatalog · templates per project
  5. District heating632 document typescatalog + templates
  6. Airports941 document typesdraft catalog · expert review pending
  7. Roads and tunnels820 document typesdraft catalog · expert review pending
  8. Hydrogen467 document typesdraft catalog · expert review pending
  9. Data centers401 document typesdraft catalog · expert review pending
  10. Food production328 document typesdraft catalog · expert review pending
  11. Telecommunications326 document typesdraft catalog · expert review pending
  12. Nuclear power595 document typesdraft catalog · expert review pending
In detailExplore the sectors in depthPer sector the technical areas down to network operation — click through.Expand
Line drawing of the selected sector
Electricity · Transmission & Distribution Networkcatalog + templatesper area: asset profiles · records · inspection & retention deadlines · gates
Overhead LineSubstation → route → pylon, with a chain of records per section.
Underground CableCable routes, joints, laying and test records.
SubstationBays, switching stations, protection and test protocols.
Grid StorageLarge-scale storage facilities in the grid — its own asset and record logic.
Battery StorageStorage facilities with their own record and deadline profile.
Grid BoosterBooster facilities for grid stabilization — its own asset type with its own test records.
HVDC & ConvertersDC transmission route including converter stations as its own branch.
OffshoreSubmarine cables and offshore connections as a distinct area.
Ground-mounted solarSolar parks from land-use planning to operation — modules, inverters, park medium voltage, acceptance and yield monitoring.
Onshore windWind farms from permitting and species protection to operation — foundation, nacelle, park electrics and commissioning.
OperationsOperations management shown separately — its own overview of ongoing operations.
Cross-Cutting DocumentsNetwork-wide records & standards — with metadata for all areas.
Deliberately kept at the structural level: the website shows how things are organized, not the underlying catalogs and rules themselves — the actual value stays in the system.
Concrete

Sample records — the right documents for each sector.

48 sample records from the five established sectors (water and wastewater listed separately) — a slice of what Linea Aurea structures for each type of infrastructure. The full catalogs and rules live in the system.

In detailSample records per sectorTypical documents with deadline and gate — switchable per sector.Expand
Electricity
In-service inspection recordProtection test reportEarthing & insulation measurementDeclaration of conformityAsset profileThermography reportJoint test (underground cable)Submarine cable laying protocol (offshore)
To the sector →
Gas
Pressure & leak test (DVGW)Pipe bookPigging protocolCathodic protection recordAsset profileOdorization recordCalibration protocol (gas pressure control facility)Cavern record (underground storage)
To the sector →
Water
Pressure testLeak testDisinfection & samplingDrinking water testingAsset profileWater treatment plant operations logCleaning record (elevated reservoir)Yield record (well)
To the sector →
Wastewater
Leak test (DIN EN 1610)CCTV camera inspectionInspection reportSewer data sheetAsset profileIndirect discharger controlPressure test (pressure main)Calibration protocol (flow metering)
To the sector →
District Heating
Pressure & leak testWeld seam testThermal insulation recordCommissioning protocolAsset profilePressure maintenance recordEmissions protocol (combined heat & power)Calibration record (heat meter)
To the sector →
Rail
Overhead line & traction power testSignal test protocolTrack surveySignalling acceptanceAsset profileSwitch test protocolAcceptance protocol (signal box)Maintenance record (substation)
To the sector →
Who is this for?

One truth — explained correctly for every role.

The same data, the view that fits. Find your role:

In detailExplained for every roleManagement, project lead, document management, operations, IT — what each role sees in the Control Center.Expand
Documentation ManagerSee at a glance which records are missing and what's next.

Monday morning, before the team meeting: a glance at the control center shows where records are missing or deadlines are approaching — not only found on the next walk through folders and emails.

  • Open records at a glance, not scattered across folders
  • Deadline alert before the gate, not after
  • QR jump-back from paper to the digital object
  • Version, inspection and retention deadline per document with a single click in the Documents tab
Project ManagementSpot handover risk and blocked work packages before the gate arrives.

Before the construction acceptance, the risk indicator shows which asset is not yet ready for acceptance — enough lead time to steer instead of improvising at the handover date.

  • Handover risk visible before it turns into a delay
  • Gate progress per asset instead of an aggregate status
  • One click from the risk to the responsible record
  • Documentation coverage per asset as a bar in the Assets tab, not just an aggregate figure
Executive ManagementOne glance: is the project ready for acceptance, where does the risk stand.

Before the status meeting with the supervisory board or shareholders: a portfolio view across all networks and sectors — without having to check back with three different departments.

  • Portfolio view across all sectors and networks
  • Risk prioritized by impact, not by volume of alerts
  • Solid figures for reporting and the board
  • All twelve sectors in the Sector switcher in the control center with comparable metrics
Inspectors / Expert AssessorsEvery statement has an evidenced path back to the document.

During the on-site inspection, the QR code on the asset nameplate leads directly to the stored record — instead of having to search the archive first.

  • Every status statement traceable back to its evidence
  • QR jump-back from asset to document
  • Chain of evidence verifiable, not just claimed
  • Access within the agreed scope through the same permission model as internal users, see FAQ
Specialist AudienceUnderstand the principle at a high level — without drowning in detail.

In a conference talk or a tender conversation, the structural principle is enough to explain the benefit — without going into system detail.

  • Principle explainable in one sentence
  • Comparable to familiar systems (DMS, CDE, GIS)
  • Depth available on demand, not forced on you
  • Every specialist term is available in the glossary on this page
IT / Information SecurityCheck architecture, data classification and access rights before a pilot starts.

Before approving the pilot, the checklist goes through point by point: deployment model, network zones, roles, interfaces — answers, not a black box.

  • Read-only at operational boundaries as a principle, not an option
  • Architecture conversation before every pilot, not after
  • Answers to the IT checklist available in advance
  • All 12 points of the IT checklist documented with a short explanation
Procurement / Contract ManagementSee the pricing logic, contract terms and exit conditions before signing.

Before placing an order, the comparison matrix clarifies commitment periods, notice periods and what happens on exit — instead of finding it in the fine print afterward.

  • Pricing logic and contract terms transparent in the comparison matrix
  • Exit conditions contractually defined, not left open
  • No blanket migration project hidden in the proposal
  • SLAⓘ is part of the individual contract under the Operator Program, not promised as a blanket guarantee
Operations / MaintenanceKeep deadlines and asset condition in view during ongoing operations — not only during the build phase.

Record-keeping doesn't end at handover: recurring inspections and deadlines keep running in the control center, with lead time instead of a surprise at the next audit.

  • Recurring inspection and retention deadlines under continuous view
  • One view for build and operations phases, no break at handover
  • Knowledge stays in the system, not tied to one person
  • The Deadlines & Gates tab calculates deadlines from inspection and retention rules per asset type — as a rule, not a reminder
Connection & Evaluation

Sits above your systems — and continuously evaluates them.

Read-only and vendor-neutral. LAD can be connected to practically any network operator system already in use — without a system change.

How LAD connects — with architecture diagram, seven examples from SAP, ELO, GIS & co. and the sync status: View system connections →

Terms

Briefly explained — the key terms.

So it's clear what we mean — compact, without jargon. All terms, including cross-sector and cross-product ones, in the full glossary.

In detailThe key termsShort version — the complete glossary has its own page.Expand
Record

A document that proves a requirement has actually been met — for example an inspection report, a declaration of conformity or an acceptance record.

Documentation Catalog

Defines, per asset and sector, which documents must be present, in what structure, and with what inspection and retention deadlines — the basis for every documentation coverage figure in the control center.

Documentation Coverage

The share of the records required by the documentation catalog that are already complete and verified for an asset, area or sector — shown as a percentage in the control center.

Domain Pack

A predefined set of rules and records for a specific sector — electricity, gas, water, wastewater, district heating or rail — including the document types and deadlines required there.

Gates (G3–G6)

The four gates in the control center, always in this order: G3 · Construction, G4 · Approval, G5 · Handover, G6 · Acceptance.

Handover Readiness

The state in which every record required for a handover or acceptance is complete and verified — measurable, not estimated.

Control Center

The central control unit for the documentation of your networks: shows based on the current data status which records are missing, where the handover risk sits, and how far the current acceptance and handover readiness has come. Not a new DMS — a layer above it.

Read-only Adapter

A connection to existing systems such as SAP, ELO, GIS or SharePoint that only ever reads data, never changes it. No migration, no data move. Seven concrete examples: System Connections.

Go to the glossary →

For your sector, for your role.

30 minutes, no system access: using your use case we check whether a pilot area can be clearly scoped — no slide deck.

  1. Send a requestBriefly, your topic and your sector.
  2. 30-minute conversationOn your use case, no system access.
  3. A clear answerWhether a pilot area can be clearly scoped.
Request 30-minute Fit Check