Everything for reference, printing and reuse — in one place.
Templates, info sheet, glossary, pilot process and IT checklist — collected for quick finding, downloading and forwarding.
Templates & info sheet.
Seven templates from five sectors as PDF samples (example "Sample Network Operator"; the editable originals come with the pilot) plus the compact info sheet for forwarding. Details and demo examples in the control center are on the Templates section of the Solution page.
Concept Study · Substation
Word report with identity and control block, standard references and QR link-back to the DMS.
↓ View sample (PDF)In-service Inspection Record
Recurring inspection of equipment — structured Excel with QR·DMS resolver.
↓ View sample (PDF)Risk Matrix & Register
Capture and assess risks in a structured way — with metadata block and QR·DMS resolver.
↓ View sample (PDF)LAD Info Sheet
Two pages: control center, how it works, security and packages — on the back all twelve sectors with sketch and figure. For forwarding or printing.
↓ Download info sheet (PDF)More sectors — same standard, own catalog
One PDF sample each from the sample sets of the other sectors, each for a fictitious sample operator. Structure, control block and QR link-back are the same everywhere.
Gas · Odorization concept
Concept for odorization and odorant verification of a gas network operator (DVGW G 280).
↓ View sample (PDF)Water · Pressure and leak test
Test of a drinking-water transmission main with assessment and section-by-section release (DVGW W 400-2, EN 805).
↓ View sample (PDF)District heating · Route documentation
As-built documentation of a pre-insulated pipe route: geometry, tests and handover to operations.
↓ View sample (PDF)Rail · Structure inspection report
Initial inspection of an engineering structure before commissioning — stability, traffic safety, durability.
↓ View sample (PDF)Reference, go deeper & calculate.
Twelve building blocks for reference, deeper reading and calculation — directly reachable.
Go deeper
Look up & check
Try & calculate
Ready for the first step?
30 minutes, no system access: using your use case we check whether a pilot area can be clearly scoped — no slide deck.
- Send a requestBriefly, your topic and your sector.
- 30-minute conversationOn your use case, no system access.
- A clear answerWhether a pilot area can be clearly scoped.








