Linea AureaDocumenta
Transparency · as of Nov 14, 2026

What is ready today — and what is in development.

The product status of Linea Aurea Documenta on one page: catalog, templates, Control Center, app and the path into your own network. Every statement links to the page where it is documented.

In short: Catalog and templates are available for five and three sectors respectively, the Control Center and the app as demos to explore — LAD comes into your own network through a scoped pilot.

  1. Document type catalog

    Available Five sectors · 8,841 typesIn development Seven sectors · 3,887 types

    Electricity, rail, water and wastewater, gas and district heating are established. Airports, roads and tunnels, hydrogen, data centers, food production, telecommunications and nuclear decommissioning exist as draft catalogs, expert review pending. Together 12,728 document types in twelve sectors.

    To domains & sectors
  2. Templates

    Available Electricity · rail · district heatingPer project Water · gas

    Catalog and templates for electricity, rail and district heating; for water and gas the templates are created per project. Samples are available as PDF, the editable originals in the pilot.

    To the template samples
  3. Control Center

    Demo To click through

    Documents, assets, deadlines & gates and source systems — four views with synthetic sample data of a sample network operator. No real operator, no real asset data.

    To the Control Center demo
  4. Field work app

    Demo Access code on request

    Installable and usable offline: pull documents, capture on site, upload to the CDE, check project status — with the same synthetic sample data.

    To the app
  5. In your own network

    In the pilot from €29,500 (net) · 8–12 weeks

    The entry point is a scoped pilot at a fixed price. How each source system is connected — path today, pilot variant and live expansion — is described under system connections.

    We define the pilot area in writing in the Fit Check beforehand — before anything is connected. Operation: read-only at operational boundaries, on-premises in your own data center or in your own cloud; details under Security & Compliance.

    To packages & pilot To system connections
Outlook

What comes next.

Three points that are already named openly today — without dates we cannot keep.

  1. TodayExpert review pending

    Seven draft catalogs

    Airports, roads and tunnels, hydrogen, data centers, food production, telecommunications and nuclear decommissioning exist as drafts. Expert review is pending — only then do they count as established.

    To the sectors
  2. In the pilotIn the operator project

    Read-only adapter per system

    We do not assume ready-made standard connectors. In the pilot, exports are enough; the adapters for ongoing operation are set up in the operator project for your system landscape.

    To the connection paths
  3. In operationIn development

    3 · 6 · 9 Field & Command App

    In development and planned for the Control License — the mobile counterpart to the Control Center in ongoing operation.

    To the packages
Catalog per sector

Twelve sectors, one core.

12,728 document types in twelve sectors

8,841 established · five sectors3,887 draft, review pending · seven sectors

  • Electricity5,210
  • Rail1,513
  • Water and wastewater749
  • Gas737
  • District heating632
  • Airports950
  • Roads and tunnels820
  • Hydrogen467
  • Data centers401
  • Food production328
  • Telecommunications326
  • Nuclear power595

Counted document types, as of Nov 14, 2026 — the same figures as on domains & sectors.

In brief

Common questions about the status.

Can we start today?

Yes — with a scoped pilot at a fixed price, from €29,500 (net) in 8–12 weeks. Electricity, rail, water and wastewater, gas and district heating are established. More under packages & pilot.

What does “draft catalog · expert review pending” mean?

The sector’s document types are captured; the expert review is still pending — only then does the sector count as established. This applies to airports, roads and tunnels, hydrogen, data centers, food production, telecommunications and nuclear decommissioning. More on domains & sectors.

Is the data in the Control Center demo and the app real?

No. Both show synthetic sample data of a sample network operator — no real operator, no real asset data.

Why are there no dates in the outlook?

Because we do not name dates we cannot keep. The read-only adapters for ongoing operation are set up in the operator project for your system landscape; the Field & Command App is in development.

How current are the figures?

They are counted document types as of Nov 14, 2026 — the same figures as on domains & sectors and on the home page.

All questions in the FAQ

Ready for the first step?

30 minutes, no system access: using your use case we check whether a pilot area can be clearly scoped — no slide deck.

  1. Send a requestBriefly, your topic and your sector.
  2. 30-minute conversationOn your use case, no system access.
  3. A clear answerWhether a pilot area can be clearly scoped.
Request 30-minute Fit Check